Draft EIS. Comment #2: Structural Integrity

ashlandrail

Draft EIS DRPT – Trench deficiencies

The DRPT (Department of Rail and Public Transport) has released their Draft Environmental Impact Statement (EIS). The public comment period ends November 7th 2017. I intend to submit a series of comments — of which this is the second.

Please take the time and trouble to submit your comments. Remember the DRPT will not respond to comments made in any other forum, including social media sites and blogs.

Here is the address: http://dc2rvarail.com/contact-us/

As best I can tell the comment software does not allow for embedded hyperlinks. Therefore I suggest that you spell out internet addresses, as shown below. Also, the comment software does not appear to allow for file or picture attachments.


Comment #2: Structural Integrity

Approximately a year and a half ago — long before the idea of a trench was considered — the DRPT conducted a survey to do with the structural integrity of the buildings…

View original post 110 more words

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s